Landlord applied for MCI rent hikes based on drainage work. The DRA ruled against landlord. Landlord appealed, claiming that the drainage work was part of the cost of qualifying sidewalk and repaving work. The DHCR ruled against landlord. The drainage work was completed five months before the other work was begun and so wasn't connected.

Landlord applied for MCI rent hikes based on drainage work. The DRA ruled against landlord. Landlord appealed, claiming that the drainage work was part of the cost of qualifying sidewalk and repaving work. The DHCR ruled against landlord. The drainage work was completed five months before the other work was begun and so wasn't connected.

Samson Mgmt. LLC/Vevette: DHCR Adm. Rev. Dckt. Nos. QA930014RO, QA930003RT, and PL930067RT (3/26/03) [20-pg. doc.]